Residents of three districts in Tashkent—Shaykhantakhur, Almazar, and Chilanzar—have been left without hot water supply due to scheduled technical works.
According to Veolia Energy Tashkent, the supply is expected to be restored by 10:00 AM on May 13. The works are being carried out on the networks of the state enterprise Suvta’minoti within the coverage area of the thermal center TC-3.
The most extensive outages occurred in Shaykhantakhur district, affecting residents of mahallas including Sarxumdon, Gulobod, Obinazir, Bogkucha, Ilgor, Zafarobod, Buston, Tinchlik, Chorsu, Karatash, and Chakar. Also included are Yangi Kamolon, Kamolon Darvoza, Kamolon, Khadra, Gulbozor, Urda, and Shaykhantakhur.
The restrictions also apply to consumers living on Navoi, Samarkand Darvoza, Abay, Abdulla Qadiri, Kokcha Darvoza, Paxtakor, and Khuvaido streets.
In Almazar district, supply has been suspended in the mahallas of Chustiy, Kuyosh, Orzu, Allon, Ziyo, Bustonobod, Istiqlol, and Universitet. Additionally, the list includes Beruni, Shifonur, Talabalar, Universitetskaya streets, the Student Town, TSTU campus, and the Karakamysh 2/1 block.
In Chilanzar district, temporary inconveniences affect the mahallas Beshyogoch and Katta Olmazor. Along with them, supply is limited on Bunyodkor Avenue, Islam Karimov, Almazar, Karatash, Furkat, Afrasiab streets, and the Small Ring Road.
Besides residential areas in these districts, the outage also covers central blocks Ts-10, 11, 13, 14, as well as Ts-26, 27, and 28. Specialists ask residents to understand the situation, emphasizing that these measures are necessary for the stable operation of the city's engineering systems.
Source: podrobno.uz