Authorities in Tashkent plan to phase out water supply to 21 city channels during the autumn-winter period. Over this time, municipal services will clean the channels, reinforce their banks and repair water facilities to prepare them for the next irrigation season. The restrictions will affect channels with a total length of 97 kilometers, including nine main channels measuring 44.4 kilometers and 12 inter-farm channels measuring 52.6 kilometers.
Key Takeaways: Tashkent plans a phased water cutoff for 21 city channels totaling 97 kilometers; the list includes nine main channels of 44.4 km and 12 inter-farm channels of 52.6 km; maintenance work is intended to prepare the channels for resumed water supply in 2027.
Context and Background
The channels form an important part of the city's water infrastructure and support irrigation, municipal needs and green areas. According to the Tashkent city administration, seasonal demand for irrigation water has ended, allowing authorities to use the colder months for maintenance. Specialists will remove accumulated silt and debris, strengthen banks, repair hydraulic structures and improve channel capacity so water can flow more freely in the next season.
The list includes Anhor, Jun, Kalkauz, Katta Kalkauz, Katta Tolarik, Katta Chala, Konkus, Chigatay, Chuponota, Novza, Akkurgan, Rakat, Kukcha, Birlik and other water arteries of the capital. Earlier reports said beautification of the banks of five major channels — Bozsu, Salar, Damashi, Jun and Burjar — is continuing in Tashkent. Together, these measures indicate a broader effort to improve the technical condition and environmental state of the city's waterways.
Removing silt and debris, reinforcing banks and repairing facilities should reduce the risk of clogging and flooding while improving water distribution during the irrigation season. For the urban environment, this means not only technical maintenance but also support for the ecological condition of waterways that pass through residential and public areas.
Outlook and Key Details
The administration said the work will improve the technical condition of the channels and prepare them for the resumption of water supply in 2027. Exact dates for shutting off and later restoring water for each channel have not yet been announced. Further official updates are expected to clarify the schedule, particularly for residents, businesses and services located along the affected channels.
Source: podrobno.uz