Currency
  • Loading...
Weather
  • Loading...
Air Quality (AQI)
  • Loading...

Uzbek President Shavkat Mirziyoyev traveled from Tashkent to Parkent district on November 20, 2025, using the newly electrified railway that began service in September, and inspected the new station complex in Parkent. During the visit, officials were instructed to improve service quality at railway stations and develop surrounding areas, supporting stronger transport links between the capital and the district while boosting Parkent’s tourism and business appeal.

Key Takeaways: Under a January 27, 2025 decision, a 535.4 billion soum project built a 24-kilometer electrified Baytkurgan–Parkent railway line; a six-car EP3D train serving 586 passengers now operates on the Tashkent–Parkent route; the 10,000-soum fare is 2.5 times cheaper than average taxi service, with capacity for up to 300,000 passengers annually.

The project was implemented under the January 27, 2025 decision on further developing Uzbekistan’s transport and logistics system: a new electrified railway line was built to connect the capital with Parkent district, and electric train service on the Tashkent–Parkent route was launched in September. The line is intended to strengthen transport links, expand residents’ mobility, increase the district’s tourism appeal, and support entrepreneurship and service-sector development.

The project included one new station, three bridges, a road overpass, 77 water-crossing structures, and 16 road-and-rail crossings; it also built 24 kilometers of contact network and power lines and created 40 new jobs. On the 57.6-kilometer route, the EP3D train can travel at up to 120 kilometers per hour and complete the journey in 1 hour 13 minutes, while carriages are equipped with climate control, comfortable seating, USB charging points, and free Wi-Fi.

Special lifts and adapted spaces were provided for people with disabilities, along with bicycle transport devices and electronic information boards; safety measures include video surveillance and systems designed to reduce impact forces in collisions. The new route can carry up to 2,000 passengers per day and 300,000 passengers per year.

The next stage is expected to focus on implementing the instructions to further improve station services and upgrade surrounding areas; the project is expected to expand reliable transport between Tashkent and Parkent while increasing passenger flow and tourism interest in the region.

Source: kun.uz