Currency
  • Loading...
Weather
  • Loading...
Air Quality (AQI)
  • Loading...

In the capital of Uzbekistan, Tashkent, a project for a new international airport has been announced, featuring the construction of two runways, each 4 kilometers long. The key parameters of the future facility were presented to President Shavkat Mirziyoyev during a presentation on modernizing transport infrastructure.

According to the presented data, the first phase of the project includes building a passenger terminal covering 208.4 thousand square meters and creating a modern airfield complex. The project aims to develop infrastructure capable of handling up to 20 million passengers per year and facilitating up to 30 takeoffs and landings per hour.

Additionally, the plan involves organizing parking for 169 aircraft. Information was provided to the president about the design and survey work being conducted on the site of the future airport, as well as the subsequent stages of project implementation.

The head of state instructed responsible agencies to ensure thorough technical and economic development of the project, organize construction work in accordance with modern standards, and guarantee long-term stable operation of the transport infrastructure. This initiative is part of efforts to enhance the country's transport system and establish a new airport with potential regional significance.

Source: podrobno.uz